Custom Polymer Concrete Tanks
- 1993 - 3 Jumbo Tanks - Falconbridge, Kidd Creek Copper Refinery
- 1994 - 4 Cells Caminco - Trail, B.C.
- 1994 - 20 Cells - 1994 Hudson Bay Mining and Smelting - Flin - Flon, Manitoba
- 1996 - 4 Jumbo Tanks - Falconbridge - Kidd Creek
- 1997 - 1 Recirculating Tank - Inco Ltd. - Acid Plant C.C.C.R.
- 1997 - 1 Surge Tank - Inco Ltd - C.C.C.R.
- 1998 - 10 Cells - Falconbridge - Kidd Creek Liberator Cells
- 1999 - 1 Surge Tank - Inco Ltd. - C.C.C.R.
- 1999 - 1 Overflow Tank - Inco Silver Refinery - built on site
- 1999 - 650 Capboards - Inco C.C.C.R.
- 1999 - Electrowinning - Cellhouse - Major Polymer Concrete restoration job on all columns and walls to improve structural integrity and acid resistance - Inco Ltd.
- 2001 - 80 Electrolytic tanks - Inco Ltd.
- 2002 - 80 Electrolytic tanks - Inco Ltd.
- 2002 - Decopperize and Recirculating Tank (40’ x 20’ x 4’) - Inco Ltd - Built on site
- 2002 - 6 Electrolytic tanks - Falconbridge Kidd Creek Metsite
- 2003 - 76 Electrolytic tanks - Inco Ltd.
- 2004 - 80 Capboards - Inco CCCR
- 2004 - 12 Electrolytic tanks - Falconbridge Kidd Creek Metsite
- 2005 - 12 Electrolytic tanks - Falconbridge Kidd Creek Metsite
- 2005 - 2 Polymer Dip Tanks, 1 Polymer Cobalt Cell, 3 Nickel Electrowinning Cells (28’ long) - Inco Limited, Argentia, N.F.
- 2006 - Capping Boards - Falconbridge Norway
- 2006 - 6 Electrolytic Tanks - Falconbridge Kidd Creek Metsite
Major Acid Refractory Projects
- 1988 - Falconbridge - Kidd Creek Division - Chemetics Absorbing Tower
- 1990 - Inco - Nickel Refinery - brick floor-new installation 10,000 ft. acid plant
- 1990 - Inco - Top blown rotary converters (TBRC)
- 1992 - Fenco - Disputada Chagres Smelter, Chile - South America - New acid plant, supply of materials and quality control of all towers and tanks.
- 1993 - Falconbridge Kidd Creek - Division Drying Tower - Supply of materials and installation
- 1993 - Falconbridge - Kidd Creek Division - Chemetics Absorbing Tower Supply of materials and installation - Smelter Acid Plant
- 1994 - Fenco - Disputada Chagres Smelter, Chile - South America - New drying tower and pumptank, supply of materials and quality control.
- 1994 - Cobatec - 3 brick lined tanks, general contractor mild steel tanks, membranes and brick lined.
- 1995 - Simon Carves - Fenco, Mexicana de Cobre - Mexico. New acid plant, supply of materials and quality control of all towers and tanks.
- 1997 - Acid pumptank - Falconbridge Kidd-Creek Division - Supply of materials and installation.
- 1999 - Acid storage tank - Falconbridge Kidd-Creek Division - Supply of materials and installation.
- 2000 - Acid plants Inco Ltd, Kidd Creek Falconbridge, Noranda Shut down maintenance work on linings.
- 2001 - Acid plants Inco, Kidd Creek Falconbridge, Noranda Shut down work maintenance on linings.
- 2002 - Acid plants Inco, Kidd Creek Falconbridge, Noranda Shut down work maintenance on linings.
- 2003 - Acid plant Inco, Kidd Creek Falconbridge, Noranda Shut down work maintenance on linings.
- 2004 - Inco Tankhouse Basement - New brick installation 12000 ft. removal & civil work included.
- 2004 - New installation of Stripping Tower - Falconbridge Kidd Creek Division - Roaster Plant
- 2004 - Replace all brickwork on 1st and 2nd pass of converter at the Roaster plant - Falconbridge Kidd Creek Division
- 2005 - New Absorbing Tower - Fenco Constructors - Falconbridge Kidd Creek Division
- 2005 - Calstock Power Plant
- 2005 - Columbia Forest Products
- 2005 - Grant Waferboard - Timmins
- 2006 - Northland Power
- 2006 - Remove and respace new aludur beams and install gridblocks - Interpass tower – Inco Limited
- 2006 - Replace acid brick flooring system - Copper Refinery Tankhouse - Falconbridge Kidd Creek Division
- 2006 - Replace acid refractory liner - Absorbing Pumptank - Noranda
- 2006 - Replace multiple hearth systems - Concentrator Dryers - Falconbridge Kidd Creek Division
- 2007 - Replace multiple hearth systems - Concentrator Dryers - Falconbridge Kidd Creek Division
|
 |
 |